US 11: Floodwall – 1st Irish Bayou Br

 

The US 11 Floodwall construction began with the directive of raising the roadway to a 3.5 grade level, to ensure maximum safety for the heavily trafficked highway that would at times flood to knee-deep levels.   Barber Bros. utilized multiple asphalt lifts to achieve the 3.5 grade level, with two crews. Though February weather made working conditions fairly unfavorable, the project was completed a day ahead of schedule, and on budget – equipping all drivers with a definitively increased measure of safety on the road.

  • Client: LA DOTD
  • Location: New Orleans East
  • Start Date: January 2018
  • End Date: May 2018
  • Value: $400,000
# # # # # # #

Elevate your game at Golden Crown casino! Uncover top-tier entertainment and massive wins at this premier Australian online casino!

Join the excitement at Casino Mate! Play top games and enjoy amazing rewards at one of Australia's favorite online casinos!

Play in style at Richard casino! Enjoy premium games and big wins at this classy Australian online casino!

Blast off to big wins at Neo Spin! Experience thrilling gameplay and fantastic rewards at this top Aussie online casino!

Spin your way to fortune at Platinum Reels! Enjoy premium games and exciting rewards at this top Australian online casino!

Explore the gallery of wins at Slots Gallery ! Play now for exciting bonuses!

Zoom to big wins at Zoome Casino! Play now for amazing bonuses!

Bet on big wins at N1Bet Casino ! Exciting games and huge rewards await!

Experience the excitement at This is Vegas Casino ! Play now for fantastic rewards!

Experience pure fun at Pure Casino ! Play now and hit the jackpot!

(225) 355-5611 | 2636 Dougherty Drive, Baton Rouge, LA 70805 | info@barber-brothers.com